Build and customize
Plan mode and Build mode
Use Plan mode to talk a change through and review a written plan before anything is built. Switch to Build mode when you want the agent to change your site.
The chat has two modes. Build changes your website. Plan only talks and writes a plan. In Plan mode nothing on your site changes until you say so.
Use Plan mode when the request is big, when you are not sure what you want, or when you want to check the idea before the agent starts.
Switch between the modes
- Look at the right side of the message box. A button shows the current mode, Build or Plan.
- Click it. A small menu opens with two choices:
- Build: "Make changes directly".
- Plan: "Discuss before building".
- Pick one. A tick shows the active mode.
You can also press Alt+P in the message box to switch back and forth.
The mode button is greyed out while the agent is working. Switch before you send, or wait for the request to finish.
What each mode does
| Build | Plan | |
|---|---|---|
| Changes your site | Yes | No |
| Output | Changed pages in the preview, and a reply saying what changed | A written plan and answers to your questions |
| Eco used | When the agent changes files | None, because no files change |
| Best for | Clear, small or medium requests | Big requests, new features, anything you want to check first |
Eco is only used when the agent actually writes or deletes files. A plan or a text-only answer does not change files, so it does not use eco. See Eco: what it is and how it is used.
Plan, then build: step by step
- Switch to Plan.
- Describe what you want, for example: "Add a booking page where customers pick a date and time."
- The agent replies and, when it has enough detail, shows a Your plan card in the chat.
- Read the plan. Change it, or answer its questions.
- Choose Build it (or Build with these answers).
- The agent builds in Build mode, following the plan step by step.
The plan card
The card gives you:
- A short summary of what will be built.
- A numbered list of steps, in the order the agent will do them.
- Show details, which opens three lists: Screens (the pages), What it remembers (the information your site keeps, and who can see it) and Kinds of user (for example customer or staff). Choose Hide details to close them.
- Up to a few optional questions, under "Optional: a few questions".
- Buttons at the bottom: Adjust the plan, Attach files, and Build it.
Answer the questions
Each question shows choices. One choice may be marked Recommended. You work through the questions one at a time.
| Control | What it does |
|---|---|
| Question buttons ("Question 1 of 3") | Jump to any question. A tick shows it is answered. |
| A choice | Picks it and moves to the next question. |
| "Or type your own answer" | Type an answer in your own words. Typed text wins over a picked choice. |
| Next / Done | Go to the next question, or finish the last one. |
| Back | Return to the earlier question. |
| Let the agent decide | Skip this question. The agent chooses and tells you what it chose. |
| Review | Shows all your answers ("Your answers"). Choose Change answers to edit one. |
You do not have to answer anything. A question you leave open is marked "Agent decides". If you answered at least one, the main button reads Build with these answers. If not, it reads Build it.
Adjust the plan
Choose Adjust the plan. The message box fills with "Before we start, I'd like to adjust the plan:" and the cursor waits at the end. Finish the sentence and send it. The agent writes a new plan that replaces the old one.
Attach files to the plan
Choose Attach files to add pictures or documents the agent should use when it builds, such as your logo or a price list. The button then shows how many are attached ("2 attached"). See Attach files and images.
If the agent is busy
If another request is running when you choose Build it, the plan joins the waiting list. It starts when the line clears. See Queue several changes.
"Build this now"
Sometimes you ask for a change while you are in Plan mode. The agent answers with a plan or advice. Under its newest reply you then see Build this now.
Click it to send the same request again in Build mode. The mode switches to Build too, so your next message builds as well.
When the agent asks you a question
In either mode the agent may stop and ask something it cannot decide for you. A card titled "Needs your answer" appears. It shows choices, with one marked Recommended and already selected. You can pick another choice or type your own answer, then choose Continue. Your answer continues the task from where it stopped.
Which mode should I use?
| Your situation | Use |
|---|---|
| "Change the header colour to dark blue." | Build |
| "Add a contact form." | Build |
| "I want an online shop but I am not sure what pages I need." | Plan |
| "Rebuild the whole site for a restaurant with bookings and a menu." | Plan, then Build it |
| You only want an explanation or advice | Plan |
If something goes wrong
- The plan card does not appear. Ask the agent to "write a plan for this". Plan mode produces the card once it has enough detail.
- You built a plan and do not like the result. Use Undo this change under the reply. See Undo changes and restore a version.
- The page broke after the build. See Fix a page that does not load.